| job | hours | startdate | finishdate | job | hours | startdate | finishdate | ||
| 1 | framing 1f | 16 | inside trim 1f | ||||||
| 2 | framing 2f | 17 | inside trim 2f | ||||||
| 3 | framing ext | 18 | outside trim | ||||||
| 4 | elec ruff 1f | 19 | doors 1f | ||||||
| 5 | elec ruff 2f | 20 | doors 2f | ||||||
| 6 | plumb ruff | 21 | decks | ||||||
| 7 | plumb trim | 22 | siding touch up | ||||||
| 8 | insulation 1f | 23 | paint outside | ||||||
| 9 | insulation 2f | 24 | paint inside 1f | ||||||
| 10 | sheetrock 1f | 25 | paint inside 2f | ||||||
| 11 | tape 1f | 26 | hvac 1st fl | ||||||
| 12 | mud 1f | 27 | hvac 2nd fl | ||||||
| 13 | sheetrock 2f | 28 | floors wd/tile 1f | ||||||
| 14 | tape 2f | 29 | floors wd/tile 2f | ||||||
| 15 | mud 2f | total hours | |||||||
| item | units | cost | total | item | units | cost | total | ||