job hours startdate finishdate first floor 1,472
framing 1f 2nd fl 1,472
framing 2f lofts 380
framing exterior total 3,324
5 electrical rough in 1f 10 5/11/2002 5/12/2002 cottage 768
6 electrical rough in 2f 10 5/12/2002 5/13/2002 efficiency 216
1 plumbing roughin 12 5/1/2002 5/2/2002 total 4,308
2 plumbing trim 8 5/3/2002 5/3/2002
9 insulation 1f 8 5/14/2002 5/15/2002
10 insulation 2f 10 5/16/2002 5/17/2002
11 sheetrock 1f 25 5/18/2002 5/20/2002
13 tape 1f 4 5/25/2002 5/25/2002
14 mud 1f 4 5/25/2002 5/25/2002
12 sheetrock 2f 32 5/21/2002 5/21/2002
15 tape 2f 4 5/26/2002 5/26/2002
16 mud 2f 4 5/26/2002 5/26/2002
inside trim 1f
inside trim 2f
outside trim
doors 1f
doors 2f
4 decks 1st and 2nd fl 32 5/7/2002 5/10/2002
3 siding touch up 24 5/4/2002 5/6/2002
paint outside
15 paint inside 1f 16 5/27/2002 5/28/2002
16 paint inside 2f 18 5/29/2002 5/31/2002
7 hvac 1st fl 10
8 hvac 2nd fl 10
17 floors wood or tile 1f 24 6/1/2002 6/3/2002
18 flloors wood or tile 2f 24 6/4/2002 6/7/2002
total hours 289
item units cost total
plumbing parts 1 276.00 276.00
3" pvc 20' pipes 10 6.80 68.00
toilets 2 74.00 148.00
2 toilet lines in and out 2 140.00 280.00
2 bath tubs 2 140.00 280.00
2 sinks 2 34.00 68.00
cut valves 10 4.50 45.00
supply valves 10 4.50 45.00
3/4 copper conduit feet 100 1.20 120.00
1/2 copper conduit feet 50 0.80 40.00
toilet rings 2 5.00 10.00
water heater 50 gal 2 185.00 370.00
electrical 1 500.00 500.00
hvac second floor 2 3,000.00 6,000.00
1st fl insul 1 749.36 749.36
2nd fl insul 1 969.00 969.00
1st fl sheet rock 1 714.00 714.00
2nd fl sheet rock 1 816.00 816.00
tape 10 3.00 30.00
mud boxes 5 5.00 25.00
paint 1st fl cans 10 15.00 150.00
paint 2nd fl cans 15 15.00 225.00
tile first fl 55 15.27 839.85
tile 2nd fl 55 15.27 839.85
wolm 2x6x16 128 11.78 1,507.84
wolm 2x4x16 80 7.87 629.60
total 15,745.50
1x4x16 80 5.31 424.80
z flashing 4 1.00 4.00
8 pitch base 8 3.00 24.00
paint, caulk & nails 1 0.00 0.00